| and now....
The SlabTek Slab Design
SLABTEK
SLABS
is totally unique and is designed to require no special
soil treatment, requires less construction time, is
not labor intensive, maintains strict quality control,
is economical to build, and provides for future adjustment.
Some
of the many unique engineering features of
SLABTEK
SLABS,
are:
They make use
of either drilled concrete piers or “helical” type piers,
to carry the load of the structure below the active
zone to the structurally stable soils beneath the surface.
However, they require approximately 40% less
piers than traditional slabs.
They are designed,
in engineering terms, as a “flat plate”, approximately
5” thick. The slabs have no interior or stiffener beams,
like traditional “waffle slabs”, only a shallow beam
around the perimeter. As a result, they require
approximately 40% less concrete.
They make innovative
and economical use of post-tension design reinforcement.
The post-tension cables are “profiled” or draped up
or down within the slab to place the reinforcement where
it is most needed.
They are poured
on top of the ground and then raised above the ground
to a desired height, with patent pending SlabTek lifting mechanisms (Slabtek LM).
Using the ground as a form is a very economical process,
much like commercial tilt-wall construction.
They use the same lifting mechanisms used to lift the
slab, to adjust the height of the slab in
the future. If, this is ever required.
Millions
of dollars are spent annually trying to design for and
anticipate soil movement under concrete foundations,
and millions more are spent to repair damaged foundations.
An innovative and revolutionary foundation design was
needed to not only address the initial cost of construction
but also long term performance and adjustability.
Innovation
was the catalyst and driving force behind the SLABTEK SLAB, creating a cost effective foundation system
that effectively eliminates foundation movement.
Advantages

|